Course Overview

V250MDC Tier 4 - Diesel Engine - Advanced  

Click here to enroll

Cost: $2,500.00 USD

Course Description

V250MDC Tier 4 - Diesel Engine - Advanced

The V250MDC Tier 4 - Diesel Engine - Advanced course provides a detailed description of the procedure to remove and install the major components in the V250MDC Tier 4 diesel engine using the appropriate tools and tensioning equipment. It consists of the following eighteen modules:

  • Running Maintenance Torques
  • Diesel Engine Checks and Adjustments
  • Valve Tappet Clearance Adjustment
  • Tensioning Familiarization and Safety
  • Cylinder Head Removal and Installation
  • Connecting Rod Bearing Cap Removal and Installation
  • Power Assembly Removal and Installation
  • Camshaft Removal and Installation
  • Main Bearings Removal and Installation
  • High-Pressure Fuel Pump Removal and Installation
  • High-Pressure Fuel Lines and Injectors Removal and Installation
  • High-Pressure Fuel System Leak Detection and Protection
  • Engine Water Pump Removal and Installation
  • Lubricating Oil Pump Removal and Installation
  • Turbocharger Removal and Installation
  • Exhaust Gas Recirculation Equipment Removal and Installation
  • Exhaust Manifold and Piping Removal and Installation
  • Coalescer Assembly Removal and Installation